Kenti Island
The remote island of Kenti is a hub of fisheries export. The only available power access on the island was from a diesel genset. Since diesel runs for four hours per day, cold storing was almost impossible. In 2017 after a World Bank investment, a solar-diesel mini grid was built. However, power capacity was soon not enough. So, BOS AG supplemented the lead-acid mini grid with BOS lithium storage systems into a hybrid solution. Today, with its extended capacity and a whole optimized system, the diesel generator is used only as a bad-weather backup and 340 households are supplied with electricity around the clock.